and the front of the music room. The white vertical things are
plumbing stubs, and the boards, of course are the rim joists.
We now have a foundation, joists and plumbing! Today, the HVAC sub-contractor was scheduled to arrive and install the heat ducting and the base of the furnace. He hadn't arrived as of the time we were there for a visit. Duane was pretty sure he would finish today, though, and we would be able to get an inspection today and start decking the foundation next week. I hope he is right, since we have a holiday on Monday, which means no inspections on Monday.